Atlassian Cloud Migration
Migrate with Zero Risk.
Atlassian Server is end-of-life. 3R Infotech has executed 200+ migrations โ from 25-user startups to 5,000+ user enterprises with 1M+ issues. Our methodology eliminates downtime risk and guarantees data integrity.
OUR NUMBERS
200+
Migrations Delivered
Server & DC to Cloud
1M+
Issues Migrated
Zero data loss guaranteed
300+
Workflows Optimized
During Migration
~0
Data Loss Incidents
Across all engagements
MIGRATION PATHWAYS
Which Migration Is Right for You?
Server โ Cloud (SaaS)
Move to Atlassian-managed SaaS. Latest features, AI (Rovo), modern security, continuous updates. Atlassian manages all infrastructure.
Server โ Data Center
On-premises control for regulated industries. High availability clustering, custom infrastructure, and specific data sovereignty requirements.
Data Center โ Cloud
Upgrade from DC to access Atlassian's AI, modern security (Guard), and continuous feature delivery. The path to full cloud adoption.
Cloud Consolidation
Merge multiple Atlassian Cloud instances post-merger or acquisition into a single optimized cloud footprint with unified governance.
OUR METHODOLOGY
5-Phase Migration Methodology
Phase 1: Assessment & Discovery
Inventory all Jira projects, Confluence spaces, users, groups, and marketplace apps. Compatibility analysis for add-ons. Data volume estimation. Compliance requirements review (GDPR, RBI, ISO 27001). Migration risk assessment and complexity scoring.
Phase 2: Environment Preparation
Target cloud environment setup. User provisioning and SSO/SAML configuration. App compatibility resolution โ replace, upgrade, or source alternatives. Data cleansing: archive stale projects, remove inactive users, rationalize custom fields.
Phase 3: Pilot Migration
Migrate 1โ2 representative projects/spaces to cloud. Validate data integrity, workflow functionality, and integration health. Stakeholder sign-off on pilot before full migration proceeds. Configuration fine-tuning.
Phase 4: Full Migration Execution
Scheduled migration window with pre-communication to all users. Incremental migration with real-time monitoring. Post-migration validation on all critical workflows, custom fields, and data integrity. Rollback capability maintained.
Phase 5: Hypercare & Adoption (30 Days)
Dedicated 30-day post-migration hypercare. User training and Q&A sessions. Dashboard setup for platform health monitoring. SLA-backed issue resolution. Adoption measurement and feature enablement.
COMPLIANCE EXPERTISE
Compliance-First Cloud Migration
NABFID Case Study:ย India's apex DFI required 100% RBI data residency. 3R Infotech implemented Atlassian Cloud with India data center region selection and the only Forge-based test management app available โ achieving full RBI compliance with zero data egress.
| Compliance Requirement | Our Approach |
|---|---|
| RBI / NBFC Compliance | 100% India data residency via Atlassian Cloud India region. Forge-based apps ensuring no data egress. Audit trail aligned to RBI IT framework guidelines. |
| GDPR (European Operations) | Data processing agreements, residency configuration, personal data minimization during migration, DSAR-ready architecture. |
| ISO 27001 | Security control mapping. Evidence collection for audit. Atlassian Guard setup for enterprise security governance. |
| PSU / Government | PSU-grade security standards implementation. Classified data handling. Integration with government infrastructure where applicable. |